Project Description
Considering the historic and architectural value of the area it has been identified a solution suitable to meet the pre-existing situation needs able to enhance architectural, logistics and landscape features that qualify the area.
The concept design tried interpreting the expectations of area as space able to show the signs of the time on the landscape. The final design has implemented a "transparent presence” that emphasizes the environmental quality of the context.
The footbridge spans 65 m about, and it's made by two longitudinal lattice steel beams. Each one is made by two main tubular profiles and by a third stabilization tubular one, converging to the ends of beam. The adopted system has allowed maintaining a remarkable visual permeability.
Project Details
- Made witheng. Andrea Totaro
- ClientProgeest Srl